Hot! Waste Tire Recycling Machine  Tire Shredder Machine

ZPS-900 sol1200 Kind Used Tyre Shredding EPT sol Comprehensive Tire Recycling Plant

Use colon this EPT is a EPT gear for crushing squander steel wire radial tyre underneath regular temperature comma utilised for get out the metal wire of tyre in the scope of the measurement interval

Attribute colon this EPT has the composition compact comma progress technological innovation comma reduced powder consumption comma large efficiency comma crushing place with off-composition period of time Straightforward to maintenance and many others period of time The EPT adopting exceptional tough alloy steel as it blade comma extremely challenging and wearable is druable semi circle mesh screen has grindding composition comma dropping items with large region is good for the rubber parts period

Specialized parameter colon

Product ZPS-900 ZPS-1200
Generation potential period8-two Ton solhour one period5-three T solh
Size of feeding le900 mm EPT tyre le1200 mm EPT tyre
Discharging particles le50 ast50mm le60 ast60mm
Motor powder 45 kw one hundred fifty five kw
Discharging motor two period2 kw 4 kw
Cutter rotate velocity sixteen r solmin 31 r solmin
Screener rotate pace 6 r solmin eight r solmin
Dimension lparL astW astH rpar two period8 ast2 period1 ast2 period4 m five period2 ast2 period8 ast3 period5 m
Weight 6 period2 T fourteen period8 T

The initial stage in tire recycling procession
Large obligation physique
Hooks and cross pulling die created of forty five num metal comma tempered and quenched
Outfitted with defense frame steering clear of the dangers in the course of doing work
Two series colon hydraulic one and mechanic one
Straightforward to operate and adjust spare parts lparhooks and cross pulling die rpar
Tire cutter Chopping tires into pieces just before shredding
Small tire pieces are easier to process in shredder
Knives made of YG-20 metal comma EPT employing time
Hydraulic control
One particular clamping cylinder and 1 cutting cylinder
Geared up with a roller platform to method large tires
Tire shredder The higher-ability shredder was EPTly deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ed for immediate dimensions reduction of tires into cleanly reduce tire chips comma measurement 50×50 mm time period reducing shafts for the generation of larger tire chips are accessible substantial torque at reduced pace reduce even the strongest tires into items interval
All building traits are made for ongoing operation in order to accomplish greatest throughput charges at cheapest costs time period
Incredibly exact tolerances amongst the reducing knives make cleanly minimize tire chips at low energy intake period
The slicing knives produced of higher good quality alloy steel can be re-sharpened and reused which raises the support existence and minimizes the functioning fees time period
The complete slicing chamber is lined with difficult use plates interval
Big doorways allow for effortless access into the reducing chamber period of time
Tire cracker The shear in between the two rollers will make tire chips into powders as well loosen rubbers comma steels and textiles
Roller physique made of cast steel
Area of roller manufactured of alloy steel comma welded when worn out
One particular flat floor roller and one particular teethed roller comma large throughput of powders
Bottom produced of forged iron
Unexpected emergency end when overload
Distance between the two rollers can be modified interval
Tough equipment EPT
Equipped with screening EPT comma magnetic separator and fiber separator comma ninety nine percnt purified rubbers will be received time period
Finals colon eight-thirty mesh
Magnetic separator Muti-phase belt style magnetic separator can reach far more purified rubbers
Separated steels will be in 1 place comma easy to accumulate
Long term magnet comma no far more EPT usage
Fiber separator Right after the grinder comma the nylon wires will be grinded into fluff semi In accordance to centrifugal force comma density distinction comma the fluff will be divided time period
The spin enthusiasts within the cyclone barrel pushed by the motor toss the compounds to the wall comma at this time comma light fluff will be upwards and tumble down into the inside of barrel semi hefty rubbers will drop down straight comma so textiles will be divided
Pulverizing unit The pulverizing device is manufactured of 3 sets pulverizers with a cyclone silo period
The pulverizer is composed of body comma principal motor comma non-pole EPT comma feeding system comma changing device and a pair of rotating disc and fastened disc period of time
The wonderful powders will be reached by the grinding and shearing of the two pin discs time period
The EPT is cooled by h2o and air to ensure the high quality of the powders period
Non-pole EPT can adjust speed of the feeding gadget to meet the material needs interval
The cyclone silo will gather the rubber EPT without dust
Finals colon thirty-80 mesh

FAQ
one periodQ colonAre you a manufacturing facility or buying and selling firm quest
A colonWe are manufacturing facility commapassed CE commaBV certification period
2 periodQ colonWhere is your manufacturing facility questHow can i visit quest
A colonOur manufacturing unit positioned in HangZhou city periodYou can fly to HangZhou liuting airport commathen we can select you up to our facotry to check out periodWarm welcome visit us interval
3 periodQ colonHow does your factory manage the top quality of EPTs and following sales support quest
A colonOur EPTs handed CE commaBV commaISO commaSGS certification commapls affirm the high quality periodAll our EPTs have 1 year guarantee comma will supply life time maintenance period of time
Our Solutions
lpar1 rparTrain how to run and preserve the products comma we can also supply a property get in touch with to install and debugging period of time
lpar2 rparProvide the formers of numerous technical specs comma and we can make according to your desire period of time
lpar3 rparGuarantee to keep the EPT in excellent mend period
15 periodWhy choose us quest
We are completely ready to give them a turnkey resolution comma by developing the line in accordance to their space comma designing all
electrical Set up comma h2o installation comma civil basis comma training their men and women and proving that they will get the targets for generation according to the layout period of time
The cost of the EPTry they are paying is a single off but the correct production layout and EPT configuration
in get to get the generation targets is the most EPTant level interval Even if someone received the most affordable EPT
quotation comma at the finish of the day comma what is depend are the production quantity comma high quality and the toughness of the
EPTs so to protect the investment in the appropriate time period
16 periodEPT amp certification colon

Hot! Waste Tire Recycling Machine  Tire Shredder Machine

Hot! Waste Tire Recycling Machine  Tire Shredder Machine