Oversea Service Gypsum Powder Stucco Making Machine


Introduction of Gypsum PowEPTProduction Line:

Controlling Portion Full Automated / Semi-Automated
Yearly capacity Customized (20, 000-300, 000 Tons For every Year)
Calcining system Ebullition furnace
Rotary kiln
Gasoline All-natural fuel, diesel, coal, heavy oil
Uncooked substance Natural Gypsum Rock (Articles of CaSO4@2H2O gt80%.)
Desulfurization Gypsum
Dephosphorization Gypsum
Completed powEPTusage Gypsum board
Plaster powder
Location time The First Placing Time: Shall Not Be Much less Than six Minutes,
The Last Setting Time: Shall Not Be More Than thirty Minutes

one. Gypsum powEPTquality stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd: in compliance with GB/T 9776-2008
two. Primary Technology(below consider Nature gypsum rock as example)
Gypsum rock – very first crushing -next crushing – grinding – calcining – growing older -concluded items (CaSO4.one/2H2O)

Soon after currently being heated and calcined with certain temperature,natural dihydrate gypsum is dehydrated and decompounded,to get the merchandise whose significant element is semi-hydrated gypsum(CaSO4.1/2H2O),that is,calained gypsum(EPTly slaked gypsum).According to different temperatures and force problems for the duration of dehydration decomposition,the acquired solution is beta-Kind calcined gypsum.Basic procedure of mechanized prouduction incEPTs five large programs:gypsum grinding,automated measuring technique,calcination technique,warmth source system,and getting older ampEPT technique.According to client’s necessity,gypsum crushing system can be included to crush huge gypsum rock to be with measurement of -30mm,and then conveyed into grinding program.

three.Payment circumstances:
A. Payment conditions: 30% T/T in progress 70%L/C or T/T
B. We can offer top quality ensure
C. Kunlun lender account available to make practical for Iranian client

About DCI:

HangZhou XiHu (West Lake) Dis.hu (West Lake) Dis. EPTry amp Gear Co., Ltd, founded in 2008, is a comprehensive EPTrprise of EPTry manufacture, analysis ampdeveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment and investment casting. It has 218 staffs and fifty three technical staffs incXiHu (West Lake) Dis.Hu (West Lake) Dis. senior engineers, engineers and professionals. It handles 30, 000 sqm land, and has machining workshop, electrical workshop and precision casting workshop with full sets of production and testing equipment. In 2008, it passed ISO9001: 2008 High quality Management System Certification. In early 2013, after on-internet site inspection and authentication by SGS, it turned audited supplier of Produced-in-China, and in Could, 2013, it passed ISO/TS16949: 2009 quotcasting and machining for automotive areas quot Good quality Administration Method Certification.

Our business EPTly types and manufactures total sets of constructing materials equipments, this sort of as paper floor gypsum board production line, gypsum powEPTproduction line (natural gypsum and chemical gypsum), fiber cement board creation line, calcium silicate board creation line, cement manufacturing line, AAC block generation line, stone production line, and so on. Certainly we also offer single EPTs, spare elements and wearing elements for these creation lines At the very same time, we create some uncooked components for the production traces, this sort of as modified starch, foaming agent, glue, etc.

Our company has nicely-skilled specialist engineers and technological groups to make sure our clients with substantial-quality equipments. The properly-experienced installation and commissioning crew and high-good quality process technologists supply our customers equally at residence and overseas with full established of technical services to make our consumers quotbuy with reassurance and use with gratification quot. In current a long time, our business has finished developing supplies tools projects in the Center East, Central Asia and Japanese Europe, and many others, and has got extremely praises for the two product good quality and following-sale solutions.

At the identical time, our firm is also professional in precision casting, and the company handed TS16949 Quality certification. We can produce excellent assortment of merchandise utilised in EPT incXiHu (West Lake) Dis.Hu (West Lake) Dis. automotive amptruck, agricultural EPTry, mining EPTry, engineering EPTry, petroleum EPTry, digital business, and so on. The castings can be created following stXiHu (West Lake) Dis.Hu (West Lake) Dis.rds this kind of as GB, ASME, DIN, NF, JIS, BS, AS, etc.

Our senior engineer has worked in casting sector for more than 40 years, and with his rich knowledge in castings, he can design and style the fittest production prepare for all the castings, eEPTly for castings with higher degree of problems. Our entire sets of examination devices and EPTs and TQM management system can ensure of reputable product high quality. The precision of castings can achieve Quality CT3-CT4, and floor roughness can attain Ra three.2 mu M. At the very same time, we can provide further-processing companies this kind of as machining, poXiHu (West Lake) Dis.Hu (West Lake) Dis.ng, electroplating, etc. So considerably, we have provided the products to BeiEPTFoton, Sany Weighty Market, ANZ, GEGA(Germany) and numerous other domestic and foreign organizations.

Because estabEPTd, we have been having quotXiHu (West Lake) Dis.Hu (West Lake) Dis.n oriEPTd, management strengthened, survival with quality, deveXiHu (West Lake) Dis.Hu (West Lake) Dis. with technological innovation quot as business spirit, to supply consumers with fittest goods and get broadly their praise. We, DCI, shall alwaEPTinsist on top quality theory of quotquality initial, client initial, crew operate, continual improvement quot, and adhere to organization philosophy of quothonesty oriEPTd, excellence pursue quot, to realize the goal of quotunited as one particular to make us successful and consumer content quot and to offer far better goods and providers for all aged and new clients. quotLet our model continue being in the customers’ minds without end quot is our good quality motivation, and we want to function collectively with all pals for common deveXiHu (West Lake) Dis.Hu (West Lake) Dis.ment.

Warmly welcome all close friends all above the world to our organization!

Countrywide StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd of Calcined Gypsum
StXiHu (West Lake) Dis.Hu (West Lake) Dis.rd No.: GB/T 9776-2008
Scope of software:
Gelled substance produced by dehydrating normal gypsum(uncooked substance). Its major component is beta-GaSOfour middot1/2H2O, with out any admixture or additive.
The normal gypsum should be in conformity with needs of quotgypsum rock(JC/T700) for generating cementing content quot gypsum rock of Grade three or much more higher grades.

Classification:
It is categorized to be 3 grades: three.,two.,and 1.six according to its 2h energy(breaking energy).

Composition:
beta-GaSO4 middot1/2H2O content material(mass portion) in Calcined gypsum need to be not less than 60.%.

Actual physical and chemical functionality:

Grade Fineness(Display screen residue of .2mm square display screen)/% Location time 2h power/MPa
Very first placing Ultimate environment Breaking power Compression toughness
three. le10 ge3 le30 ge3. ge6.
two. ge2. ge4.
one.6 ge1.6 ge3.

Note: 1Mpa=10.2kgf/cm2

Obligation of Consumer and Vendor

Geared up by Buyer
one.1 EPTry and tools for installation, commission and maintenance
one.2 Transportation instrument:two sets of forklifts
one.3 EPT supply technique
a. High-voltage EPT supply
b. Substation and distribution station
one.four. Drinking water offer amp storage and drainage technique
one.5 Civil engineering: Creating building, tools basis(incXiHu (West Lake) Dis.Hu (West Lake) Dis. pre-burying perform), metal-concrete structure silos and pools.
1.six Substance employed for producing EPT’s platform and supporting frame of products
Provided by Customer
two.1 Supplying spherical-excursion ticket and other transportation price for the Seller’s personnel
two.two Delivering accommodation and all sorts of necessary added expenses for the Seller’s employees for the duration of installation and commissioning and training period
2.3 Supplying all necessary huge equipment for set up, this kind of as crane, forklift, welder, acetylene amp oxygen cutting EPT, and so forth
two.four Delivering assistant personnel to cooperate with the Seller’s personnel throughout installing according to the Seller’s necessity
two.five Utilization authorization for EPT tools
Provided by Seller
2.one Generation gear
2.two Gypsum Board Production Line,
Delivering installation XiHu (West Lake) Dis.Hu (West Lake) Dis. engineers and complex workers
2.three Providing one team leaders and one interpreters
2.four Providing gear basis drawings, EPT arrangement drawing of production line (structure prepare, elevation drawing and facet view drawing) inside forty daEPTafter acquiring down payment
2.5 Providing equipments’ operation guide for the duration of instruction
two.6 Offering major equipments’ EPT assembly drawing, wiring diagram of management cabinets, PLC personal computer plans within 7 daEPTafter acceptance
two.7 The Seller is in charge of commissioning and education
a. Commissioning: the Seller shall ship engineers and technical workers to EPT site to do total-scale tests, and the Purchaser shall also send assistant workers to cooperate with the Seller’s people.
b. The Seller’s workers in demand of commissioning will do overall performance operation, make on-website speeches and answer questions to Buyer’s professionals and procedure personnel unEPTtraining. During the EPT process of testing, equally sides shall perform with each other. Following Buyer’s workers master procedure approach, the Vendor will hand over the EPT operating line to the Buyer’s for procedure and then the coaching work is finished.
two.8 Inside of one calendar year soon after signing the Acceptance Certification, the Vendor shall supply technological session to the Customer for totally free. If the Seller’s people are asked to be on the web site, the Customer shall offer spherical-way tickets and accommodation abroad.

Environmental defense:

Major air pollution sources:
Squander residue: Waste board and board edge minimize down, and so forth.
Waste water: The sediment water still left following the supporter circulation use in the merchandise procedure, from washing pool and bathroom h2o.
Sounds: primarily is 95Db(A)or so noise from the supporter.
Dust: From miXiHu (West Lake) Dis.ng material and chopping board.
Disposal approaches:
Waste residue and disposal: It does not pollute the surroundings and can be re-used afterreprocessing in gypsum powEPTproduction line.
Waste water and disposal: No EPT squander water. The dwelling wastewater is drained into the EPT sewage network, and the manufacturing wastewater from cleansing floor in the workshops can be recycled right after the secondary sedimentation. And the h2o utilised in these kinds of gear as supporter can also be recycled.
Noise and deposition: Sound, which largely comes from fan. In addition to environment soft joints at the exhaust inlet and exhaust outlet. Established impedance complicated mufflers at the exhaust outlet, which can low the sound as a lot as 30Db (A).
Dust and disposal: Dust selection gadgets will be geared up in the production method.

Labor sanitation

Safety design and style
Basic safety layout for manufacturing unit region
The factory highway visitors layout and out of doors fireplace hydrant arrangement will be in conformity with each and every requirement in quotAchitectural Design Hearth Avoidance Norm quot The pavements and drivewaEPTare easy, unblocked, and there are enough lights faXiHu (West Lake) Dis.Hu (West Lake) Dis.ties at evening Established addresses above the draniage ditches in the manufacturing unit Make it easy to go by way of, discharge, handy and safe at the very same time do virescence in the EPT manufacturing unit to minimize the dust and noises.
Security design for workshop
In the workshop, particular risk-free distance should be left for the main passages and running passages, in between equipments and the creating, between equipment and tools, and in between gear and passages Set guard rail on all workbench edges Set handles over drainage ditches Lighting is enough in the workshop All electrical equipments have ground security, and there is overhauling EPT of 36V to guarantee of overhaul protection.
Hazardous factor in producing:
Variety of damaging material: Noises from fan, air compressor, etc.
Measures to reduce harmful aspects: Do ideal to select low sounds equipments to minimize the sound from audio supply, and in the meantime insert anti-vibration gentle connectioner and muffler on the enthusiast.
Precautionary measures of protection and sanitation
Protective appliances shall be allotted to each and every employee according to genuine functioning circumstances All gear is managed by specified individual, the comprehensive operational treatment shall be produced. Workers on obligation should have on basic safety training and corresponding expertise coaching strictly work in accordance to operation process to ensure the person’s safety and equipment’s good issue Regularly have on security education to staff Regularly manage protection inspecton to dispel the accident likely in time.
Explosionproof
Explosive materials are not developed and discharged in the generation workshop of this project. There is no element of explosion.
Fire preventing program
Our products is not simple to generate fireworks, so will not want any corresponding fire detection unit.

Oversea Service Gypsum Powder Stucco Making Machine

Oversea Service Gypsum Powder Stucco Making Machine