Squander Tyre commaTire Recycling EPTry
hydraulic technique comma easy procedure and protected period of time
Mechanical description colon the tires far more than 800 require to reduce comma and lower into 4 items in EPT periodthe measurement of piece is 200-500mm period of time
Notes for employing tire cutter colon
a period of time Inspect the knives often comma if seem evident blunt comma it ought to be preserve well timed comma and the services is two-3 a long time time period
b time period the oil in hydraulic station should be filtered and changed regularly period of time EPTly filter after each and every one particular and fifty percent calendar year period of time
c period Sporting areas colon rubber seals comma sent with another established when ship the EPT to the buyer period of time
three amp4 period EPT tire shredEPTZPS-900
Use colon
This EPT can right crush tires smaller than 800mm tires interval At the EPT temperature comma can be set immediately crushed into fifty ast fifty mm block comma so the next rotating can grind into 10-30 meshes or wire and fiber separation tools time period
Attribute colon
This EPT is a compact construction comma innovative technological innovation comma reduced strength consumption comma high efficiency comma smashing off the check place for the composition comma servicing is especially practical semi resources with carbide surfacing technological innovation comma large hardness comma substantial put on resistance comma and repeated repair making use of comma so has a EPTer services daily life semi rotary display for the lattice construction of metal mesh comma blanking massive region comma enabling the screening of qualified rubber interval Right after the partition of huge tires can attain the effect of the exact same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can immediately be damaged into fifty ast50 mm of rubber block interval
Notes for using EPT tire shredder colon
a period Inject gear oil into EPT oil lparhypoid equipment oil rpar comma principal bearings use calcium-based grease lubrication comma 3 months after the operation of the EPT comma the oil must be replaced and cleanse the gasoline tank period Since then modify the oil after time each and every calendar year period of time
b After deal with 3 comma000 tons of waste rubber lparin standard situations rpar commathe consumer must grind the blade cutting edge once time time period The blades is the put on elements comma the EPT provider daily life is 5-6 several years comma when providing the EPT to the buyer comma the shredEPTwill be equipped with edge hardness layer patching substance lparelectrodes rpar interval
five period of time Double Rolls Rubber Crusher XKP-560
Use colon
Mainly employed for crack big rubber blocks into forty-50mm small rubber blocks period
Complex parameters colon
Construction colon The rollers undertake alloy chilly difficult solid irons with dress in-resisting comma sturdy characters period of time The mill flour is with tooth comma substantial groove period
In orEPTto lengthen the service existence of the cracker comma we advise build foundations for rubber cracker period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard equipment surface EPT with decrease sounds and EPTer provider life period of time
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with wonderful operating platforms comma all the wires will be connected well from controlling system to motor period of time When using the EPT comma the customers just want to connect immediately to the EPT interval
Squander Tyre commaTire Recycling EPTry
No period of time | Identify | Product | Qty time period lparQty rpar |
Motor EPT lparKW rpar | ||
one | Solitary hook debeader | LSJ-1200 | 1 | eleven | ||
2 | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
5 | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
6 | Huge conveyor gear | BCL-eight | 1 | two | ||
7 | Small conveyor equipment | BCL-three | 1 | 1 period1 | ||
eight | Huge Magnet separator | BMS22 | 1 | two period2 | ||
9 | Tiny Magnet separator | SMS-one | 1 | one period1 | ||
ten | Massive Shaking monitor | BSS-8 | 1 | seven period5 | ||
eleven | Little Shaking display | SSS-3 | one | three | ||
12 | Fiber separator | FS110 | 1 | 5 period5 | ||
13 | Fine Rubber Powder Pulverizing EPT | XJFS-420 | 4 | 123 | ||
Square vibrating sieve | 600 | 1 | ||||
Rubber powder collector | JFS500 | one | seven period5 plus0 period75 equals8 period25 | |||
Screw conveyer | Phi200mm | 1 | period75 | |||
Screw conveyer | Phi132mm | 1 | period75 | |||
Storage pin | one period5cbm | one | ||||
Hopper | 1 | |||||
Belt conveyer | 1 | period75 | ||||
14 | Steel Baller EPT | 30T | one | seven period5 | ||
15 | Rubber powder EPT EPT | one | three | |||
24 | 334 period4KW |
No | Title | product | quantity | EPT | ||
EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
1 | Ring cutter | QQJ-1200 | one | five period5KW | ||
two | Loop EPT | YQJ-295 | 1 | 15KW | ||
three | Strip cutter | QTJ-370 | one | 5 period5 KW | ||
four | Block cutter | QKJ-two hundred | 1 | 11 KW | ||
Rubber powder processing colon you will get twenty-thirty mesh rubber powder commaat the same time comma separate the fiber and metal wire | ||||||
five | Tyre crusher | XKP400 | one | forty five KW | ||
XKP450 | fifty five KW | |||||
XKP560 | 75 KW | |||||
6 | Massive conveyor products | BCL-eight | 1 | 2 KW | period | |
7 | Modest conveyor gear | BCL-three | 1 | 1 period1 KW | ||
eight | Large Magnet separator | BMS22 | 1 | two period2 KW | ||
9 | Little Magnet separator | SMS-1 | one | one period1 KW | ||
ten | Massive Shaking screen | BSS-eight | one | seven period5 KW | ||
11 | Tiny Shaking display | SSS-3 | time period | 1 | three KW | |
twelve | Fiber Separator | FS110 | 1 | eleven KW |